The calculation chain
- Boards are rounded up per room, then summed:
ceil(area ÷ rooms × (1 + waste) ÷ sheet area) × rooms - Material = boards × board price + compound × price + tape × price
- Labour = area × rate × regional factor
- Demolition = area × demolition rate, only for tear-out and replace.
- Budget tiers = base cost × 0.9 / 1.0 / 1.15.
About the regional factor
Regional coefficients are not market-calibrated yet, so every region currently uses a factor of 1.0 and the selection does not change the total. The control exists so calibrated factors can be dropped in later without touching the formulas — no unverified regional pricing is presented as fact.